Abstract
In the 1980’s, a massive paradigm shift
hit factories throughout the US and Europe. Mass production and
scientific management techniques from the early 1900’s were questioned as
Japanese manufacturing companies demonstrated that ‘Just-in-Time’ was a
better paradigm. The widely adopted Japanese manufacturing concepts came
to be known as ‘lean production’. In time, the abstractions behind lean
production spread to logistics, and from there to the military, to
construction, and to the service industry. As it turns out, principles of
lean thinking are universal and have been applied successfully across many
disciplines.
Lean principles have proven not only to be
universal, but to be universally successful at improving results. When
appropriately applied, lean thinking is a well-understood and well-tested
platform upon which to build agile software development practices.
Introduction
Call a doctor for a routine appointment
and chances are it will be scheduled a few weeks later. But one large HMO
in Minnesota schedules almost all patients within a day or two of their
call, for just about any kind of medical service. A while ago, this HMO
decided to worked off their schedule backlogs by extending their hours,
and then vary their hours slightly from week to week to keep the backlog
to about a day. True, the doctors don’t have the comforting weeks-long
list of scheduled patients, but in fact, they see just as many patients
for the same reasons as they did before. The patients are much happier,
and doctors detect medical problems far earlier than they used to.
The idea of delivering packages overnight
was novel when Federal Express was started in 1971. In 1983, a new
company called Lens Crafters changed the basis of competition in the
eyeglasses industry by assembling prescription glasses in an hour. The
concept of shipping products the same day they were ordered was a
breakthrough concept when LL Bean upgraded its distribution system in the
late 1980’s. Southwest Airlines, one of the few profitable airlines these
days, saves a lot of money with its unorthodox method of assigning seats
as people arrive at the airport. Dell maintains profitability in a
cutthroat market by manufacturing to order in less than a week. Another
Austin company builds custom homes in 30 days.
The common denominator behind these and
many other industry-rattling success stories is lean thinking. Lean
thinking looks at the value chain and asks: How can things be structured
so that the enterprise does nothing but add value, and does that as
rapidly as possible? All the intermediate steps, all the intermediate
time and all the intermediate people are eliminated. All that’s left are
the time, the people and the activities that add value for the customer.
Origins of Lean
Thinking
Lean thinking got its name from a 1990’s
best seller called The Machine That
Changed the World : The Story of Lean Production.
This book chronicles the movement of automobile manufacturing from craft
production to mass production to lean production. It tells the story of
how Henry Ford standardized automobile parts and assembly techniques, so
that low skilled workers and specialized machines could make cheap cars
for the masses. The book goes on to describe how mass production provided
cheaper cars than the craft production, but resulted an explosion of
indirect labor: production planning, engineering, and management. Then
the book explains how a small company set its sights set on manufacturing
cars for Japan, but it could not afford the enormous investment in single
purpose machines that seemed to be required. Nor could it afford the
inventory or large amount of indirect labor that seemed necessary for mass
production. So it invented a better way to do things, using very low
inventory and moving decision-making to production workers. Now this
small company has grown into a large company, and the Toyota Production
System has become known as ‘lean production’.
“The mass-producer uses narrowly skilled
professionals to design products make by unskilled or semiskilled workers
tending expensive, single-purpose machines. These churn out standardized
products at high volume. Because the machinery costs so much and is so
intolerant of disruption, the mass-producer adds many buffers – extra
supplies, extra workers, and extra space – to assure smooth production….
The result: The customer gets lower costs but at the expense of variety
and by means of work methods that most employees find boring and
dispiriting.”
Think of the centralized eyeglasses
laboratory. Remember that Sears used to take two or three weeks to fill
orders from its once-popular catalog. Recall the long distribution
channel that used to be standard in the computer market. Think dinosaurs.
Centralized equipment, huge distribution centers and lengthy distribution
channels were created to realize economies of scale. They are the side
effects of mass-production, passed on to other industries. What people
tend to overlook is that mass-production creates a tremendous amount of
work that does not directly add value. Shipping eyeglasses to a factory
for one hour of processing adds more handling time by far than the
processing time to make the glasses. Adding retail distribution to the
cutthroat personal computer industry means that a manufacturer needs six
weeks to respond to changing technology, instead of six days. Sears’
practice of building an inventory of mail orders to fill meant keeping
track of stacks of orders, not to mention responding to innumerable order
status queries and constant order changes.
“The lean producer, by contrast, combines
the advantages of craft and mass production, while avoiding the high cost
of the former and the rigidity of the later… Lean production is ‘lean’
because it uses less of everything compared with mass production – half
the human effort in the factory, half the manufacturing space, half the
investment in tools, half the engineering hours to develop a new product
in half the time. Also, it requires keeping far less than half the
inventory on site, results in many fewer defects, and produces a greater
and ever growing variety of products.”
While on a tour of a large customer,
Michael Dell saw technicians customizing new Dell computers with their
company’s ‘standard’ hardware and software. “Do you think you guys could
do this for me?” his host asked. Without missing a beat, Dell replied,
“Absolutely, we’d love to do that.”
Within a couple of weeks, Dell was shipping computers with
factory-installed, customer-specific hardware and software. What took the
customer an hour could be done in the factory in minutes, and furthermore,
computers could be shipped directly to end-users rather than making a stop
in the corporate IT department. This shortening of the value chain is the
essence of lean thinking.
Companies that re-think the value chain
and find ways to provide what their customers value with significantly
fewer resources than their competitors can develop an unassailable
competitive advantage. Sometimes competitors are simply not able to
deliver the new value proposition. (Many have tired to copy Dell; few
have succeeded.) Sometimes competitors do not care to copy a new
concept. (Southwest Airlines has not changed the industry’s approach to
seat assignments.) Sometimes the industry follows the leader, but it
takes time. (Almost all direct merchandise is shipped within a day or two
of receiving an order these days, but the Sears catalog has been
discontinued.)
Lean Thinking in Software Development
eBay is a company which pretty much
invented ‘lean’ trading by eliminating all the unnecessary steps in the
trading value chain. In the mid 1990’s, basic eBay software capabilities
were developed by responding daily to customer requests for improvements.
Customers would send an e-mail to Pierre Omidyar with a suggestion and he
would implement the idea on the site that night. The most popular
features of eBay, those which create the highest competitive advantage,
were created in this manner.
Digital River invented the software
download market in the mid 1990’s by focusing on ‘lean’ software
delivery. Today Digital River routinely designs and deploys sophisticated
web sites for corporate customers in a matter of a weeks, by tying the
corporation’s legacy databases to standard front end components customized
with a ‘look and feel’ specific to each customer.
In the mid 1990’s, Microsoft implemented
corporate-wide financial, purchasing and human resource packages linked to
data warehouses which can be accessed via web front-ends. Each was
implemented by “a handful of seasoned IT and functional experts… (who got)
the job done in the time it takes a … committee to decide on its goals.”
In each of these examples, the focus of
software development was on rapid response to an identified need.
Mechanisms were put in place to dramatically shorten the time from problem
recognition to software solution. You might call it ‘Just-in-Time’
software development.
The question is – why isn’t all software
developed quickly? The answer is – rapid development must be considered
important before it becomes a reality. Once speed becomes a value, a
paradigm shift has to take place, changing software development practices
from the mass production paradigm to lean thinking.
If your company writes reams of
requirements documents (equivalent to inventory), spends hours upon hours
tracking change control (equivalent to order tracking), and has an office
which defines and monitors the software development process (equivalent to
industrial engineering), you are operating with mass-production
paradigms. Think ‘lean’ and you will find a better way.
Basic Principles of Lean Development
There are four basic principles of lean
thinking which are most relevant to software development:
The Basic Principles of Lean Development
|
|
Add Nothing But
Value (Eliminate Waste) |
|
Center On The
People Who Add Value |
|
Flow Value From
Demand (Delay Commitment) |
|
Optimize Across
Organizations |
Add Nothing But Value (Eliminate Waste)
The first step in lean thinking is to
understand what value is and what activities and resources are absolutely
necessary to create that value. Once this is understood, everything else
is waste. Since no one wants to consider what they do as waste, the job
of determining what value is and what adds value is something that needs
to be done at a fairly high level. Let’s say you are developing order
tracking software. It seems like it would be very important for a
customer to know the status of their order, so this would certainly add
customer value. But actually, if the order is in house for less than 24
hours, the only order status that is necessary is to inform the customer
that the order was received, and then that it has shipped, and let them
know the shipping tracking number. Better yet, if the order can be
fulfilled by downloading it on the Web, there really isn’t any order
status necessary at all.
To develop breakthroughs with lean
thinking, the first step is learning to see waste. If something does not
directly add value, it is waste. If there is a way to do without it, it
is waste. Taiichi Ohno, the mastermind of the Toyota Production System,
identified seven types of manufacturing waste:
The Seven Wastes of Manufacturing
|
|
Overproduction |
|
Inventory |
|
Extra Processing
Steps |
|
Motion |
|
Defects |
|
Waiting |
|
Transportation |
Here is how I would translate the seven
wastes of manufacturing to software development:
The Seven Wastes of Software Development
|
|
Overproduction =
Extra Features |
|
Inventory =
Requirements |
|
Extra Processing
Steps = Extra Steps |
|
Motion = Finding
Information |
|
Defects = Defects
Not Caught by Tests |
|
Waiting = Waiting,
Including Customers |
|
Transportation =
Handoffs |
Extreme Programming (XP) is a set of
practices which focuses on rapid software development. It is interesting
to examine how XP works to eliminate the seven wastes of software
development:
Waste in Software Development
|
How Extreme Programming Addresses Waste
|
|
Extra Features |
Develop only for
today’s stories |
|
Requirements |
Story cards are
detailed only for the current iteration |
|
Extra Steps |
Code directly from
stories; get verbal clarification directly from customers |
|
Finding Information |
Have everyone in
the same room; customer included |
|
Defects Not Caught
by Tests |
Test first; both
developer tests and customer tests |
|
Waiting, Including
Customers |
Deliver in small
increments |
|
Handoffs |
Developers work
directly with customers |
‘Do It
Right The First Time’
XP advocates developing software for the
current need, and as more ‘stories’ (requirements) are added, the design
should be ‘refactored’[7]
to accommodate the new stories. Is it waste to refactor software?
Shouldn’t developers “Do It Right the First Time?”
It is instructive to explore the origins
of the slogan “Do It Right the First Time.” In the 1980’s it was very
difficult to change a mass-production plant to lean production, because in
mass production, workers were not expected to take responsibility for the
quality of the product. To change this, the management structure of the
plant had to change. “Workers respond only when there exists some sense
of reciprocal obligation, a sense that management actually values skilled
workers, … and is willing to delegate responsibility to [them].”[8]
The slogan “Do It Right the First Time” encouraged workers to feel
responsible for the products moving down the line, and encourage them to
stop the line and troubleshoot problems when and where they occurred.
In the software industry, the same slogan
“Do It Right the First Time,” has been misused as an excuse to apply
mass-production thinking, not lean thinking to software development.
Under this slogan, responsibility has been taken away from the developers
who add value, which is exactly the opposite of its intended effect. “Do
It Right the First Time” has been used as an excuse to insert reams of
paperwork and armies of analysts and designers between the customer and
the developer. In fact, the slogan is only properly applied if it gives
developers more, not less, involvement in the results of their work.
A more appropriate translation of such
slogans as “Zero Defects” and “Do It Right the First Time” would be “Test
First”. In other words, don’t code unless you understand what the code is
supposed to do and have a way to determine whether the code works. A good
knowledge of the domain coupled with short build cycles and automated
testing constitute the proper way for software developers to “Do It Right
the First Time”.
Center
On The People Who Add Value
Almost every organization claims it’s
people are important, but if they truly center on those who add value,
they would be able to say:
The people doing the work are the center of
|
|
Resources |
|
Information
|
|
Process Design
Authority |
|
Decision Making
Authority |
|
Organizational
Energy |
In
mass-production, tasks are structured so that low skilled or unskilled
workers can easily do the repetitive work, but engineers and managers are
responsible for production. Workers are not allowed to modify or stop the
line, because the focus is to maintain volume. One of the results of
mass-production is that unskilled workers have no incentive to volunteer
information about problems with the manufacturing line or ways to improve
the process. Maladjusted parts get fixed at the end of the line; a poor
die or improperly maintained tool is management’s problem. Workers are
neither trained nor encouraged to worry about such things.
“The truly lean plant has two key
organizational features: It transfers the maximum number of tasks and
responsibilities to those workers actually adding value to the car on the
line, and it has in place a system for detecting defects that quickly
traces every problem, once discovered, to its ultimate cause.”[9]
Similarly in any lean enterprise, the focus is on the people who add
value. In lean enterprises, traditional organizational structures give
way to new team-oriented organizations which are centered on the flow of
value, not on functional expertise.
The first experiment Taiichi Ohno
undertook in developing lean production was to figure out a way to allow
massive, single-purpose stamping machines to stamp out multiple parts.
Formerly, it took skilled machinists hours, if not days, to change dies
from one part to another. Therefore, mass production plants had many
single purpose stamping machines in which the dies were almost never
changed. Volume, space, and financing were not available in Japan to
support such massive machines, so Ohno set about devising simple methods
to change the stamping dies in minutes instead of hours. This would allow
many parts of a car to be made on the same line with the same equipment.
Since the workers had nothing else to do while the die was being changed,
they also did the die changing, and in fact, the stamping room workers
were involved in developing the methods of rapid die changeover.
Ohno transferred most of the work being
done by engineers and managers in mass-production plants to the production
workers. He grouped workers in small teams and trained the teams to do
their own industrial engineering. Workers were encouraged to stop the
line if anything went wrong, (a management job in mass-production).
Before the line was re-started, the workers were expected to search for
the root cause of the problem and resolve it. At first the line was
stopped often, which would have been a disaster at a mass-production
plant. But eventually the line ran with very few problems, because the
assembly workers felt responsible to find, expose, and resolve problems as
they occurred.
It is sometimes thought that a benefit of
good software engineering is to allow low skilled programmers to produce
code while a few high skilled architects and designers do the critical
thinking. With this in mind, a project is often divided into requirements
gathering, analysis, design, coding, testing, and so on, with decreasing
skill presumably required at each step. A ‘standard process’ is developed
for each step, so that low-skilled programmers, for example, can translate
design into code simply by following the process.
This kind of thinking comes from
mass-production, where skilled industrial engineers are expected to design
production work for unskilled laborers. It is the antithesis of lean
thinking and devalues the skills of the developers who actually write the
code as surely as industrial engineers telling laborers how to do their
jobs devalues the skills of production workers.
Centering on the people who add value
means upgrading the skills of developers through training and
apprenticeships. It means forming teams that design their own processes
and address complete problems. It means that staff groups and managers
exist to support developers, not to tell them what to do.
Flow Value From Demand
(Delay Commitment)
The idea of flow is fundamental to lean
production. If you do nothing but add value, then you should add the
value in as rapid a flow as possible. If this is not the case, then waste
builds up in the form of inventory or transportation or extra steps or
wasted motion. The idea that flow should be ‘pulled’ from demand is also
fundamental to lean production. ‘Pull’ means that nothing is done unless
and until an upstream process requires it. The effect of ‘pull’ is that
production is not based on forecast; commitment is delayed until demand is
present to indicate what the customer really wants.
Pulling from demand can be one of the
easiest ways to implement lean principles, as LL Bean and Lens Crafters
and Dell found out. The idea is to fill each customer order immediately.
In mass-production days, filling orders immediately meant building up lots
of inventory in anticipation of customer orders. Lean production changes
that. The idea is to be able to make the product so fast that it can be
made to order. True, Dell and Lens Crafters and LL Bean and Toyota have
to have some inventory of sub-assemblies waiting to be turned into a
finished product at a moments notice. But it’s amazing how little
inventory is necessary, if the process to replenish the inventory is also
lean. A truly lean distribution channel only works with a really lean
supply chain coupled to very lean manufacturing.
The “batch and queue” habit is very hard
to break. It seems counterintuitive that doing a little bit at a time at
the last possible moment will give faster, better, cheaper results. But
anyone designing a control system knows that a short feedback loop is far
more effective at maintaining control of a process than a long loop. The
problem with batches and queues is that they hide problems. The idea of
lean production is to expose problems as soon as they arise, so they can
be corrected immediately. It may seem that lean systems are fragile,
because they have no padding. But in fact, lean systems are quite robust,
because they don’t hide unknown, lurking problems and they don’t pretend
they can forecast the future.
In Lean Software Development, the idea is
to maximize the flow of information and delivered value. As in lean
production, maximizing flow does not mean automation. Instead, it means
limiting what has to be transferred, and transferring that as few times as
possible over the shortest distance with the widest communication
bandwidth as late as is possible. Handing off reams of frozen
documentation from one function to the next is a mass-production
mentality. In Lean Software Development, the idea is to eliminate as many
documents and handoffs as possible. Documents which are not useful to the
customer are replaced with automated tests. These tests assure that
customer value is delivered both initially and in the future when the
inevitable changes are needed.
In addition to rapid, Just-in-Time
information flow, Lean Software Development means rapid, Just-in-Time
delivery of value. In manufacturing, the key to achieving rapid delivery
is to manufacture in small batches pulled by a customer order. Similarly
in software development, the key to rapid delivery is to divide the
problem into small batches (increments) pulled by a customer story and
customer test. The single most effective mechanism for implementing lean
production is adopting Just-in-Time, pull-from-demand flow. Similarly,
the single most effective mechanism for implementing Lean Development is
delivering increments of real business value in short time-boxes.
In Lean Software Development, the goal is
to eliminate as many documents and handoffs as possible. The emphasis is
to pair a skilled development team with a skilled customer team and give
them the responsibility and authority to develop the system in small,
rapid increments, driven by customer priority and feedback.
Optimize across
Organizations
Quite often, the biggest barrier to
adopting lean practices is organizational. As products move from one
department to another, a big gap often develops, especially if each
department has its own set of performance measurements that are unrelated
to the performance measurements of neighboring departments.
For example, let’s say that the ultimate
performance measurement of a stamping room is machine productivity. This
measurement motivates the stamping room to build up mounds of inventory to
keep the machines running at top productivity. It does not matter that
the inventory has been shown to degrade the overall performance of the
organization. As long as the stamping room is measured primarily on
machine productivity, it will build inventory. This is what is known as a
sub-optimizing measurement, because it creates behavior which creates
local optimization at the expense of overall optimization.
Sub-optimizing measurements are very
common, and overall optimization is virtually impossible when they are in
place. One of the biggest sub-optimizing measurements in software
development occurs when project managers are measured on earned value.
Earned value is the cost initially estimated for the tasks which have been
completed. The idea is that you had better not have spent any more than
you estimated. The problem is, this requires a project manager to build
up an inventory of task descriptions and estimates. Just as excess
inventory in the stamping room slows down production and degrades over
time, the inventory of tasks required for earned value calculations gets
in the way of delivering true business value and also degrades over time.
Nevertheless, if there is an earned value measurement in place, project
tasks are specified and estimated, and earned value is measured. When it
comes to a choice between delivering business value or earned value (and
it often does), earned value usually wins out.
To avoid these problems, lean
organizations are usually structured around teams that maintain
responsibility for overall business value, rather than intermediate
measurements such as their ability to speculate and pad estimates.
Another approach is to foster a keen awareness that the downstream
department is a customer, and satisfying this internal customer is the
ultimate performance measurement.
The paradigm shift that is required with
lean thinking is often hindered if the organization is not structured
around the flow of value and focused on helping the customer pull value
from the enterprise. For this reason, software development teams are best
structured around delivering increments of business value, with all the
necessary skills on the same team (eg. customer understanding / domain
knowledge, architecture / design, system development, database
administration, testing, system administration, etc.).
Software Development
Contracts
Flow along the value stream is
particularly difficult when multiple companies are involved. Many times I
have heard the lament: “Everything you say makes sense, but it is
impossible to implement in our environment, because we work under
contracts with other organizations.” Indeed, the typical software
development contract can be the ultimate sub-optimizing mechanism.
Standard software contracts and supplier management practices have a
tendency to interfere with many lean principles.
Manufacturing organizations used to have
the same problem. For example, US automotive companies once believed the
best way to reduce the cost of parts in an automobile was with annual
competitive bidding. If the only thing that is important is cheap parts,
competitive bidding may seem like the best way to achieve this goal.
However, if overall company performance is more important, then better
parts which integrate more effectively with the overall vehicle are more
valuable. In fact, there is an direct correlation between an automotive
company’s profitability and its degree of collaboration with suppliers.[10]
When Chrysler moved from opportunistic to collaborative relationships with
its suppliers in the late 1990’s, it’s performance improved significantly.
The software industry has some lessons to
learn in the area of contractual agreements between organizations. It
needs to learn how to structure collaborative relationships which maximize
the overall results of both parties. A key lesson the software industry
needs to learn is how to structure contracts for incremental deliveries
that are not pre-defined in the contract, yet assure the customer of
prompt delivery of business value appropriate to their investment. Here
again, we can learn from lean production.
Lean manufacturing organizations develop a
limited number of relationships with ‘trusted’ suppliers, and in turn,
gain the ‘trust’ of these suppliers. What does ‘trust’ mean? “Trust [is]
one party’s confidence that the other party in the exchange relationship
will fulfill its promises and commitments and will not exploit its
vulnerabilities.”[11]
“…trust…[is] not based on greater interpersonal trust, but rather greater
trust in the fairness, stability, and predictability of [the company’s]
routines and processes.”[12]
It has been the practice of legal
departments writing software contracts to put into contractual language
all of the protections necessary to keep the other side ‘honest.’
However, the transaction costs associated with creating and monitoring
such contracts are enormous. Many contracts all but demand a waterfall
process, even if both companies believe this is not the best approach.
It’s time that the software development industry learned the lesson of
Supply Chain Management – “Extraordinary productivity gains in the
production network or value chain are possible when companies are willing
to collaborate in unique ways, often achieving competitive advantage by
sharing resources, knowledge, and assets…. Today competition occurs
between value chains and not simply between companies.”[13]
Summary and Conclusion
The lean production metaphor is a good one
for software development, if it is applied in keeping with the underlying
spirit of lean thinking. In the past, the application of some
manufacturing concepts to software development (‘Do It Right the First
Time’ comes to mind) may have lacked a deep understanding of what makes
lean principles work. The underlying principles of eliminating waste,
empowering front line workers, responding immediately to customer
requests, and optimizing across the value chain are fundamental to lean
thinking. When applied to software development, these concepts provide a
broad framework for improving software development.